Marinad Engineering
PackaginglinetechnicaldrawingforKayraMutfakÜrünleri
Complete technical drawings and documentation for the installation of a new packaging line.
Challenge
The equipment drawings supplied by the vendor didn't directly match the facility's existing infrastructure.
Approach
We redrew the line against the facility's actual plan and prepared detailed documentation for installation.
Results
- A facility-specific, buildable drawing set
- Mismatches resolved before installation
- Shorter installation time
- Client
- Kayra Mutfak Ürünleri
- Year
- 2025
- Services Used
- 2D/3D Technical DrawingAutoCAD
Have a project in mind?
Whether it's a new brand identity or an end-to-end digital transformation — let's figure out where to start, together.

